Skip to main content

A topping out ceremony was held at the Toperini Industrial Park in the Smart Warehouse of CECZ Logistic Park Management Kft. TSPC Group was responsible for the general design of the warehouse. The new e-commerce industrial and logistics centre, which is the result of an investment in Chinese-Hungarian cooperation, is ready for construction. TSPC Group is assisting the general contractor Pallér Csarnok Kft. with design engineering services.

The warehouse is stocked with general-use goods available for online purchase and health materials in designated zones.

The warehouse will be constructed with cost-effective structures and technical solutions, with particular attention to the status of the global building materials market and the trade supply chains affecting other sectors. A special feature of the warehouse is the robotised technology with a system provided by the client. The façade of the building will be constructed with restrained use of colour, maintaining the character and functions of the building.

From a sustainability perspective, the aim is to enclose the site, install a small-scale solar panel array on the roof of the building and design a passive air conduction system created by TSPC’s Climate Energy Engineering Design (CEED) team for efficient, climate-free cooling and heating. The CEED team paid particular attention to testing to create the best possible engineering solution.

The planned building will be constructed with cost-effective design and technical solutions. The Smart Warehouse will create 210 new jobs, including 170 warehouse jobs and 40 office jobs. The long-term goal is to develop a facility and infrastructure that will also provide training for students oriented towards the warehousing and logistics industry.

Client: CECZ Logistic Park Management Kft.

Project management contractor: EEB Eurázsiai Mérnöki Kft.

General designer: TSPC Kft.

General contractor: Pallér Csarnok Kft.