20×70 meters
riding hall
stand for
6500 persons
13-meter-high
jury tower
1 acre
four-seasons track
The renovated building complex of the Lipica Equestrian Centre in Szilvásvárad was handed over in two phases: in addition to the covered equestrian centre, the stadium and the service buildings were also reconstructed.
During the development of the scattered buildings, the race office was enlarged, and the jury tower renovated.
The equestrian facility also fulfils touristic functions and complies with the strictest rules of the world competitions, as the area includes an 80×120 m four-season racetrack, a 6,500-seat grandstand, a 60×114 m four-season warm-up track and a 20×70 m indoor racetrack.
Activity: detailed construction drawings, project coordination, designer supervision
Credits: Kádár Mihály, Faltusz Csaba, Vezér-Vereb Éva, Bán Márton, Gönye Péter, Hitró Enikő, Kovács Dóra Judit, Lakomcsik Attila, Parai Zoltán, Szalai Dóra, Szente Zoltán, Vörös Eszter Veronika
Client: Mészáros és Mészáros Kft. és EuroCampus Kft.
Photos: Palkó György